RESCHREITER ENERGIETECHNIK GMBH

A-5300 Hallwang bei Salzburg
Gewerbestrasse 6
Telefon: +43 (662) 66 29 66
Telefax: +43 (662) 66 30 56
E-Mail


FN 361079z
UID: ATU 66915136

GMT +1h:   

>> News

Automation switchboards for Power Plant Lebring - AUSTRIA

19.06.2012

Power Distribution

For the VERBUND power plant LEBRING, a river-run plant at the river Mur and north of the community Lebring in Styria, RESCHREITER ENERGIE GMBH produced and delivered the corresponding automation cabinets, necessary for the renewal of the control system.

  

Project name Power Plant Lebring Automation panel
Project type river-run power plant
Location Lebring / Styria / Austria
Scope of supply Manufacturing
MV distribution -
Transformer -
LV distribution -
Bus-bar -
Fields Rittal TS8
Compensation -
PLC control Siemens SICAM
I/O points -
SCADA -
Communication -
E-Installation  
Project status 06/2012 delivery panels

 

Scope of delivery and performance characteristics:

  • Porduction or automation control panels with SIEMENS SICAM Telecontrol modules
  • Operator panels to control the weirs

Go back

RESCHREITER ENERGIETECHNIK GMBH | Tel.: +43 662 66 29 66 | E-Mail